Hi Ganesh,
Check the validity date of the BOM, routing and production version. Check in the quantity structure the BOM being captured in the cost estimate run. Ensure that it captures the correct BOM.
Hi Ganesh,
Check the validity date of the BOM, routing and production version. Check in the quantity structure the BOM being captured in the cost estimate run. Ensure that it captures the correct BOM.