Hi Riddhi,
That is correct. As described in your example, two reports that are linked to one another via OpenDocument do not necessarily need to have the same number or same type of prompts.
Hi Riddhi,
That is correct. As described in your example, two reports that are linked to one another via OpenDocument do not necessarily need to have the same number or same type of prompts.