Dear Experts,
I have created a maintenance plan with frequency is 36 Months. After scheduling system generated maintenance order, and I have completed the order with system date, Example. 13.09.2014.
As I did, in IP10 for the plan it is showing completed date as 13.09.2014, and proposed the next plan date.
But, Later due to my requirement change, the completion date should be 10.11.2013. So I have canceled the TECO for the order, and while doing RE TECO, manually given the date as 10.11.2013.
Now in IP10 next calibration date is showing correctly as 10.11.2016 (10.11.2013 + 3 Years, Shift factor early, late completion is 100%). But last completion date is not updating from 13.09.2014 to 10.11.2013.
Does system will update the last completion date, if I do Re-TECO?
How can I get update the Last completion date is as RE-TECO date.
Regards,
Anil