Hi,
I have a question with regards to HU management. May I know if, under standard SAP, that an Inbound delivery will be created automatically when posting a GRN against a purchasing order into a HUM-managed storage location?
If this is true, I wonder what I miss out on my system because there is no inbound delivery generated. See below my system posting and configuration.
A) System configuration:
B) Transaction.
When trying to perform GRN against this PO item 0020, the following error appears.
Why system does not allow me to post GRN to generate inbound delivery?
Next, I tried another way, by removing the confirmation control key in the PO. However, system complained about missing confirmation control key. However, before the error message appear, I can see the message bar at the bottom showing “delivery being prepared”.
Any idea what is missing?
Regards,
Tuff