Hi Tham,
The report 'Control and Risk Matrix' considers only those controls for which risk can be assigned.
Secondly, it shows the list of controls for which the control attribute 'Control or Process Step' is set to
'Control'.
Please check both of them for the controls not visible in the report.
Regards,
Silky